Full Feasibility Study, design and business plan for the Lumzi river Hydro Power Plant, 12 MW project concession bidding

Oil Industry, Energy and Environment Studies

  • Project Name: Full Feasibility Study, design and business plan for the Lumzi river Hydro Power Plant, 12 MW project concession bidding
  • Segment Length:
  • Client/Financing: MC Interte
  • Study Year: 2013
  • Construction Cost: € 11,7 M