Full Feasibility Study, design and business plan for the Lumzi river Hydro Power Plant, 12 MW project concession bidding
Oil Industry, Energy and Environment Studies
- Project Name: Full Feasibility Study, design and business plan for the Lumzi river Hydro Power Plant, 12 MW project concession bidding
- Segment Length:
- Client/Financing: MC Interte
- Study Year: 2013
- Construction Cost: € 11,7 M