Railway connection between Albania and Kosovo, L=108km (incl. 12km tunnel)
Feasibility Study
- Project Name: Feasibility Study for the Railway connection between Albania and Kosovo, L=108km (incl. 12km tunnel)
- Segment Length: 108 km
- Client/Financing: General Rails Directorate
- Study Year: 1999
- Estimated Construction Cost: $ 756 M