Feasibility Study for the Adriatic-Ionian Road Corridor (Route 1 and Route 2) - Montenegro and Albania (WB14-REG-TRA-01 )

Feasibility Study

  • Project Name: Feasibility Study for the Adriatic-Ionian Road Corridor (Route 1 and Route 2) - Montenegro and Albania (WB14-REG-TRA-01 )
  • Segment Length: 305 km
  • Client/Financing: WYGCOWI-Atkins-Arup Joint-Venture
  • Study Year: 2018-2019
  • Construction Cost: € 3 Billion