Feasibility Study for the Adriatic-Ionian Road Corridor (Route 1 and Route 2) - Montenegro and Albania (WB14-REG-TRA-01 )
Feasibility Study
- Project Name: Feasibility Study for the Adriatic-Ionian Road Corridor (Route 1 and Route 2) - Montenegro and Albania (WB14-REG-TRA-01 )
- Segment Length: 305 km
- Client/Financing: WYGCOWI-Atkins-Arup Joint-Venture
- Study Year: 2018-2019
- Construction Cost: € 3 Billion