Detailed Design of North- South Corridor, Lezhë - Shkodër Highway

Feasibility Study

  • Project Name: Feasibility Study and Detailed Design of North- South Corridor, Lezhë - Shkodër Highway
  • Segment Length: 35 Km
  • Client/Financing: World Bank
  • Study Year: 1996 - 1997
  • Construction Cost: $85 M