Detailed Design of North- South Corridor, Lezhë - Shkodër Highway
Feasibility Study
- Project Name: Feasibility Study and Detailed Design of North- South Corridor, Lezhë - Shkodër Highway
- Segment Length: 35 Km
- Client/Financing: World Bank
- Study Year: 1996 - 1997
- Construction Cost: $85 M