Feasibility Study and Design of Berat By-pass, systematization of Osum River nearby and New Urban development of 36 Ha benefited area

Feasibility Study

  • Project Name: Feasibility Study and Design of Berat By-pass, systematization of Osum River nearby and New Urban development of 36 Ha benefited area
  • Segment Length: h 4,2 km (incl. 800 m tunnel and 1 bridge) and 44 ha
  • Client/Financing: Berat Municipality
  • Study Year: 2013 -
  • Construction Cost: € 65,7 M