Feasibility Study and Design of Berat By-pass, systematization of Osum River nearby and New Urban development of 36 Ha benefited area
Feasibility Study
- Project Name: Feasibility Study and Design of Berat By-pass, systematization of Osum River nearby and New Urban development of 36 Ha benefited area
- Segment Length: h 4,2 km (incl. 800 m tunnel and 1 bridge) and 44 ha
- Client/Financing: Berat Municipality
- Study Year: 2013 -
- Construction Cost: € 65,7 M