Detailed design of pedestrian cable bridge with metallic truss at Fierza Hydropower Plant

Feasibility Study

  • Project Name: Detailed design of pedestrian cable bridge with metallic truss at Fierza Hydropower Plant
  • Segment Length: 75,4 m
  • Client/Financing: Albanian Electro-energetic corporation
  • Study Year: 2011
  • Estimated Construction Cost € 0,55 M