Detailed design of motorway double tube tunnel, part of Durrës- Morinë corridor

Bridges, Tunnels, Airports, and Ports

  • Project Name: Detailed design of motorway double tube tunnel, part of Durrës- Morinë corridor
  • Segment Length 2x235m
  • Client/Financing Albanian Roads Authority
  • Study Year 2009 -
  • Construction Cost € 16,2 M