Detailed Design of “Guri Bardhe” Tunnel, located on the road section “Tunnel Entrance Qafë Murriz - Exit Ura e Vashës” - Part of Arberi Road

Bridges, Tunnels, Airports, and Ports

  • Project Name: Detailed Design of “Guri Bardhe” Tunnel, located on the road section “Tunnel Entrance Qafë Murriz - Exit Ura e Vashës” - Part of Arberi Road
  • Segment Length 560m
  • Client/Financing Albanian Roads Authority
  • Study Year 2010
  • Construction Cost € 10,8 M